199Kw Biomass Install

Dorlec Ltd are a major Turnkey company based in  Chesterfield.  The company operates from its 20,000 sq ft facility at Clay Cross.

We installed an ETA HACK 199kW Biomass Boiler, along with a 2200 Ltr Buffer tank, 35 tonne Silo and remote monitoring control system.

 

Dorlec Case Study

Posted in Case StudiesTagged in ,